## Case Studies

---

### [Case Study: Calvert North](https://www.thetransportal.com/index.php/2024/10/08/calvert-north-case-study/)

#### Oct 8, 2024  
by [AK](https://www.thetransportal.com/index.php/blog/#) in [Case Studies](https://www.thetransportal.com/index.php/category/case-studies/)  
Overview: The Calvert area is the location of an important intersection between two new railway networks, which will see HS2 running underneath the East West…

---

### [Case Study: A417 Missing Link](https://www.thetransportal.com/index.php/2024/10/08/a417-missing-link-case-study/)

#### Oct 8, 2024  
by [AK](https://www.thetransportal.com/index.php/blog/#) in [Case Studies](https://www.thetransportal.com/index.php/category/case-studies/)  
Overview: Kier is working for National Highways on the A417 Missing Link Project in Gloucestershire, dualling the final section of the single carriageway to link…

---

### [Case Study: Mansfield SUDS](https://www.thetransportal.com/index.php/2024/10/08/mansfield-suds-case-study/)

#### Oct 8, 2024  
by [AK](https://www.thetransportal.com/index.php/blog/#) in [Case Studies](https://www.thetransportal.com/index.php/category/case-studies/)  
Introduction: Kier NRNN has been contracted to Severn Trent Water to work on the Mansfield Sustainable Drainage Systems (SUDS) project, the largest of its kind…

---

### [Case Study: Kier Construction Western & Wales](https://www.thetransportal.com/index.php/2024/10/09/case-study-kier-construction-western-wales/)

#### Oct 9, 2024  
by [AK](https://www.thetransportal.com/index.php/blog/#) in [Case Studies](https://www.thetransportal.com/index.php/category/case-studies/)  
Overview: Kier Construction Western & Wales have been using Transportal CDE for a number of years now and are currently using it on over £200m worth…
